.
  Vyom World.com . Let's Touch the Sky Together!  
.

Home
VyomWorld.com Home
Interview Questions
VyomLinks.com Home
JobsAssist.com Home
Vyom Network
Contact Us
Jobs & Careers
Resume Submitter
Placement Papers
IT Companies Directory
Computer Jobs
Interview Questions
Online Exams
Vyom Career eMag.
Fun
Send FREE SMS!
SMS Jokes
Source Codes Library
Source Codes Home
ASP Source Codes
C Source Codes
C++ Source Codes
COBOL Source Codes
Java Source Codes
Pascal Source Codes
Submit Source Codes
GATE
GATE an Overview
GATE Preparation
Study Materal
GRE
GRE an Overview
GRE Questions
GRE Preparation
GRE Universities
TOEFL Preparation
TOEFL Resources
GMAT Preparation
GMAT Resources
MBA Preparation
MBA Resources
Networking Concepts
Networking Concepts
Testing Preparation
Testing Resources
Webmasters
Free Traffic Builder
Webmaster Articles
Web Hosting
Tutorials
Hardware Tutorial
1500 Free eBooks New!


Home » Placement Papers » Aztec Placement Papers » Aztec Previous Year Placement Paper

 

Aztec Placement Paper - Technical Assistant


Advertisements
Advertisements




Aztec Previous Years Solved Sample Placement Papers

  1. Which of the following integers has the most number of divisors? 1) 176 2) 182 3) 99 4) 101

    Answer: 2

    Explanation: 176 = 2,4,8,11,16,22,44,88 182 = 2,7,13,14,26,91 99 = 3, 9, 11, 33 101 = 101

  2. A man goes from city A to city B situated 60 km apart by a boat. His onward journey was with the stream while the return journey was an upstream journey. It took him four and a half hours to complete the round trip. If the speed of the stream is 10 km/hr, how long did it take him to complete the onward journey? 1) 3 hours 2) 3.5 hours 3) 2.25 hours 4) 1.5 hours

    Answer: 4

  3. If the wheel of a bicycle makes 560 revolutions in travelling 1.1 km, what is its radius? 1) 31.25 cm 2) 37.75 cm 3) 35.15 cm 4) 11.25 cm

    Answer: 1

  4. A man driving his bike at 24 kmph reaches his office 5 minutes late. Had he driven 25% faster on an average, he would have reached 4 minutes earlier than the scheduled time. How far is his office? 1) 24 km 2) 72 km 3) 18 km 4) Data Insufficient

    Answer: 3

  5. Train A traveling at 60 km/hr leaves Mumbai for Delhi at 6 P.M. Train B traveling at 90 km/hr also leaves Mumbai for Delhi at 9 P.M. Train C leaves Delhi for Mumbai at 9 P.M. If all three trains meet at the same time between Mumbai and Delhi, what is the speed of Train C if the distance between Delhi and Mumbai is 1260 km? 1) 60 km/hr 2) 90 km/hr 3) 120 km/hr 4) 135 km/hr

    Answer: 3

  6. Fresh Grapes contain 90% water by weight. Dried grapes contain 20% water by percentage. What will be the weight of dried grapes when we begin with 20 kg of fresh grapes?

    (a) 2 kg

    (b) 2.4 kg

    (c) 2.5 kg (Ans)

    (d) None

  7. How many 5-digit numbers can be formed with digits 1, 2, 3, 4, 5, 6, which are divisible by 4 and digits not repeated?

    (a) 144

    (b) 168

    (c) 192 (Ans)

    (d) None

  8. There is a rectangular garden whose length and width are 60 m and 20 m. There is a walkway of uniform width around the garden. The area of the walkway is 516 mind the width of the walkway.

    (a) 1

    (b) 2

    (c) 3 (Ans)

    (d) 4

  9. If \(1 = (3/4)(1 + (y/x))\), then:

    (a) \(x = 3y\) (Ans)

    (b) \(x = y/3\)

    (c) \(x = (2/3)y\)

    (d) None

  10. The sum of six consecutive odd numbers is 888. What is the average of the numbers?

    (a) 147

    (b) 148 (Ans)

    (c) 149

    (d) 146

  11. Sequence: 1, 27, 125, ?, 729, 1331. Find the missing number.

    Answer: 343 (Ans)




 


.

Recently Updated: New Placement Papers added.
Vyom Network : Web Hosting | Dedicated Server | Free SMS, GRE, GMAT, MBA | Online Exams | Freshers Jobs | Software Downloads | Programming & Source Codes | GRE Preparation | Jobs, Discussions | Software Listing | Free eBooks | Free eBooks | Free Business Info | Interview Questions | Free Tutorials | International Business Information | IAS Preparation | Jokes, Songs, Fun | Free Classifieds | Free Recipes | FAQs | Free Downloads | Bangalore Info | Tech Solutions | Project Outsourcing, Web Hosting | GATE Preparation | MBA Preparation | SAP Info | Excellent Mobiles | Software Testing | Interview Questions | Freshers Jobs | Server Insiders | File Extension Directory

Copyright ©2003-2025 Vyom Technosoft Pvt. Ltd., All Rights Reserved. Read our Privacy Policy