Home »
Placement Papers »
TCS Placement Papers »
TCS Placement Paper-24 July 2006,Ranchi
TCS Placement Paper-24 July 2006,Ranchi
Tata Consultancy Services
TCS-Placement Paper-24 July 2006-Ranchi
In BIT MESRA, TCS came on 24th July 2006. They conducted online exam for some and paper exam for others by randomly selecting of us. Now we r having our interview on 31th july and 1st aug. In between we r having microsoft oracle tvs, maruti etc.
Written:-
Verbal: 20 min
Comprehension
14th edition:- like her white friends(page no :- 106)
for comprehensive it is better 2 learn or go through all the passage of the comprehensive part. 14th edition page no 97 to 113
fill in the blank
set y:-observe the dilemma of fungus of the comprehensive part
set z:- some university problem.
Antonyms
Comply
Cavil
Repugnance
Desultory
Assuage
Vouchsafe
Protract
Revile
Reasoning: 30 min
Verbal :-
All words i.e. synonyms(10) was from gre model test paper and antonym exercise. so verbal section was very easy for me
Aptitude:-
Nothing new all the questions was from previous paper some of those r as:--
1. the bit operation question was given
A 10010010
B 01110010
C 10100010
Find Au(BnC) , (A-B)uC all value were in decimal value?
2. find odd one out:-1. Sybase 2.DB2 3.Oracle 4.Unix
3. 5 quest. Was based on DI
7. What is the largest prime number that can be stored in an 8-bit
8. Base of 1234 which is 194 in decimal.
9. g(0)=1 g(1)= -1 g(n)=3*g(n-1)-2*g(n-2) find g(4)
10. one coding was given
11. one number series has to fill
12. The size of a program is N. And the memory occupied by the program is given by M = square root of 4000N. If the size of the program is increased by 1% then how much memory now occupied?
13. In calcutta, temperature at noon varies according to t^2/6 + 12t + 12, where t is elapsed time from noon.Find how much temperature more or less in 3pm to 6pm.
14. A 2D array is declared as A[9,7] and column wise each element requires 8 byte. If A[ 1,1 ] is stored in 1200. Find the memory of A[8,5] ?
(Note:- all set contain column wise)
15. 3 Venn - diagram was given related to bangla ,Punjabi,&gujarati questions were asked
Ans, 17.4, 1, 6
21. recognize the equation of curve related to cosx and sinx curve
22. Number of faces, vertices and edges of a cube 6 8 12
23. A and B do a work in 7 days. If A does double as B the how many days take A to do?
24. find the result of the following expression if , M denotes modules operation, R denotes round-off, T denotes truncations M(363,5)+R(5.8) +T(7,7)-R(3.8)
25. The size of the bucket is 10kb. The bucket fills at the rate of 0.0001 kb per millisecond to fill bucket it takes 100 milisecond to reach to destination.it takes 100 milisecond to passack so calc. how much time will it take to pass n kb write formula(I don't know the exact figure)
26. Which of the following are orthogonal pairs a) 2x+3y=6 b) 2x+5y=0 c) 2y=3x+6 d) 7x+y=4
27. If A, B, C are the mechanisms used separately to reduce the wastage of fuel by 25%, 20%, 10%. What will be the fuel economy if they were used combine? Ans :-46
28. WHICH SHAPE WILL BE OBTAINED BY USING THESE VALUES OF X ,Y
X Y
0 0.00001
10 1.02
100 1.72
1000 3.00
9999 4.72
Ans: Y= log10(X)
29. Find the value of <@<4-<@4, where < denotes "square" and @ denotes "change in sign".
30. What is the power of 2? a. 2068 b.2048 c.2668 ANS: (B). 2048
31. My flight takes of at 2am from a place at 18N 45E and landed 9 Hrs later at a place with coordinates 36N45W. What is the local time when my plane landed.
32. A power unit is there by the bank of the river of 900 meters width. A cable is made from power unit to Power a plant opposite to that of the river and 3000mts away from the power unit. The cost of the cable below water is Rs. 5/- per meter and cost of cable on the bank is Rs.2/- per meter. Find the length where the cable is to be cut. ANS: 2100m
33. Find the singularity matrix from a given set of matrices?
34. Which of the following set of numbers has the highest Standard deviation?
5,0,5,0,5,0
-5,-5,-5,-5,-5,-5.
5,0,5,0,5,0
-5,5,-5,5,-5,5
35. Match the following:
1. Mammal, cow ---> a. A type of
2. Snake reptile ---> b. A part of
3. Roof - Building ---> c. Not a type of
4. Mushroom - Vegetables ---> d. A superset of
36. a , b, c can do a work in 4 days. if a does twice as much as work in 12 and b can work in 18 in how many days c can do?
37. b g b d q m b g d m g b g g b q m b g q b g
d g b a m g b g m
How many b 's are such that each b is followed by g next to it, if the g is not followed by d next to it.
Reasoning:-
1.model test 3-section 6 Quest 1-4
2. model test 1- tunnel-bridge- highway problem
3. model test 1- red and brown problem
All the reasoning was from GRE sets
|
|